A Quick Guide to Instrument Approach Segments
A standard instrument approach procedure helps pilots transition from en-route flight to landing under Instrument Flight Rules (IFR).
Approach Segments:
• Entry point for the approach.
• Aligns the aircraft with the next segment.

• Prepares for final descent.
• Ensures a stable approach path.

• Beginning of the final descent to the runway.
• Pilots confirm altitude, speed, and alignment.

• If the runway is not in sight, a missed approach is initiated.
• The aircraft follows a designated route to a holding fix for further instructions.